Project loads are considered those that exceed the standard scope of containers, for example, oversized transformers, wind blades or even parts and industrial presses. The project segment is a market that has a lot of demand because industries are always modernizing with what is offered in the market.
In order to deal with the demands of oversized loads, it is necessary to carry out prior work on feasibility studies and analyses. These are crucial processes for determining many variants of the project, resulting in a more cohesive and smooth logistical development.
Unlike general cargo, which are mostly shipped in standard containers and do not always require a lashing, lifting and handling analysis by the operational team.
How is the project load study done?
The feasibility study stage is an indispensable process in project logistics, as many points need to be aligned with logistics partners and customers, such as:
- Partner shipowner named for the shipment has all the necessary equipment for handling the cargo, in addition to space.
- If the cargo is packed according to the export and import rules of both ends of the chain. (Origin and destiny)
- If the cargo is able to be handled in the way proposed by the partners.
How is oversized cargo shipped?
In the feasibility study process, those responsible for analysis at COLI-Shipping come up with several possibilities and analyze which will be the best for the moment based on the information provided by customers and COLI experience.
The studies carried out in the development of the project are not limited to sea or air freight, when it comes to oversized loads, the service can often be done door-to-door, for this, it will be necessary to carry out a study of cargo loading on ships, unloading, adjusting the loads on the cars that will transport it to the destination and many times road studies.
For example, the handling of wind blades cannot always be carried out in all locations without making a certification that the route will not compromise the integrity of the truck, the cargo or even the roads.
For this, reliability in the expertise of its nominated logistics partners is crucial, as processes like these can occur unforeseen and require market knowledge that stands out in moments when quick actions need to be taken.